Last night VMDO architects presented three very preliminary concepts for the Reed site.
The concept designs start on p. 35 of the pdf linked below.
https://www.apsva.us/wp-content/uploads/2017/11/171129_REED_PFRCBLPC_FINAL.pdf
They have three concepts, a north concept, an east concept, and a south concept. The north and south concepts both include an A version, in which they DO NOT build on top of the existing building, and a B version in which they do. The east concept involves an entirely new building on the sled hill and divides the school into two buildings
Feedback sought! They hope to finalize the concepts and deliver them to the school board by February
Contact Mike O’Malley or Dianne Hasselman