Tour of the Stormwater Detention Vault at Cardinal ES

Preparing for the tour
Remote controlled machine compacting the soil over the top of the detention vault
Kathleen Trainor and Mark Greenwood from the Torreyson Run Stormwater task force. The interior of the vault is twelve feet high

Inside the vault
A row of individual pre-cast vault cells in place

Leave a comment