Tour of the Stormwater Detention Vault at Cardinal ES
Preparing for the tourRemote controlled machine compacting the soil over the top of the detention vaultKathleen Trainor and Mark Greenwood from the Torreyson Run Stormwater task force. The interior of the vault is twelve feet high
Inside the vaultA row of individual pre-cast vault cells in place